Arnold Laver Timber World’s engineered products division has designed and manufactured a roof truss solution for a Salvation Army children’s day nursery building in Leeds.
The package, including roof trusses, in-fill timbers and bracing, was erected in just three weeks, while the whole roof project took two months, from initial concept to fitting.
Arnold Laver’s engineered products division has the capacity to manufacture 2,000 trusses per week, as well as making timber frames. It is also a Master Dealer for Trus Joist‘s Silent Floor and Roof Framing System, with a capacity to produce 80 floors per week.