The original floor of the Royal Armouries Hall at the Royal Armouries Museum, Leeds has been covered with more than 900m2 of solid oiled oak flooring from Junckers.

The new 22mm floor was laid over the existing surface to speed up refurbishment and get the hall back into commission as quickly as possible.

New developments in Junckers’ specialist oil products have reduced the maintenance required for the company’s wooden floors.